Built to the drawing, at a fixed price.

CPJ Construction brings chartered-standard technical rigour to transparent, fixed-price construction, delivered in strict compliance with UK Building Regulations.

Three kinds of work, one standard

From structural garage conversions to full residential renovations and commercial fit-outs, every job is held to the same technical standard and priced the same transparent way.

  • Structural garage conversions

    Turning a garage into a room you live in is structural work. The floor, walls, insulation and old door opening all have to reach the standard of a habitable room, and every conversion is delivered in strict compliance with the Building Regulations.

    More on garage conversions
  • Full residential renovations

    Whole-home renovation, where layouts change, walls move and performance improves. The structural and regulatory side is treated as seriously as the finish you see.

    More on renovations
  • Commercial fit-outs

    Fit-outs for commercial spaces, built to UK Building Regulations with the same chartered-standard rigour and a transparent, fixed price.

    More on commercial fit-outs

Fixed price.

Transparent, fixed-price construction

CPJ Construction works on a fixed-price basis and keeps that pricing transparent, so you can plan your budget around a clear figure for the job.

Chartered-standard technical rigour

Structure, detailing and compliance get the same attention as the parts you see every day. It is the technical side of building done properly, on homes and commercial premises alike.

Strict compliance with UK Building Regulations

The Building Regulations are split into parts, each setting the standard for one aspect of a building. A structural garage conversion, for example, will typically need to meet several of them.

  • Part A: Structure
  • Part B: Fire safety
  • Part C: Moisture and contaminants
  • Part D: Toxic substances
  • Part E: Resistance to sound
  • Part F: Ventilation
  • Part G: Sanitation, hot water safety and water efficiency
  • Part H: Drainage and waste disposal
  • Part J: Combustion appliances and fuel storage
  • Part K: Protection from falling, collision and impact
  • Part L: Conservation of fuel and power
  • Part M: Access to and use of buildings

Central London to Guildford, along the A3 corridor

CPJ Construction works on homes and commercial premises from Central London, down the A3 corridor, to Guildford.

  1. Central London
  2. The A3 corridor
  3. Guildford

Tell us what you want to build

Send a few details about your garage conversion, renovation or fit-out, or call to talk it through.